How Long It Takes to Replace a Furnace: Timeline, Costs, and Pro Tips

Homeowners often ask, “How long does it take to replace a furnace?” The short answer is usually one day. The long answer depends on the furnace type, home layout, permits, and whether duct or vent changes are needed. This guide explains average timelines, what can shorten or lengthen the job, and how to prepare for a smooth, code-compliant installation.

Average Furnace Replacement Time At A Glance

For a like-for-like swap with no major complications, most pros complete a furnace replacement in 4 to 8 hours. That covers removal, new unit placement, connections, startup, and essential safety checks.

  • Simple electric or standard gas swap: 4–6 hours
  • High-efficiency condensing gas furnace: 6–10 hours (venting and condensate work)
  • Oil furnace: 8–12 hours (oil line, filter, chimney or liner concerns)
  • Complicated or custom installs: 1–2 days
  • Full duct modifications or zoning: 2–3 days or more
Task Typical Duration Notes
Site Protection & Safety Setup 15–30 minutes Floor covers, tool staging, power/gas shutoff
Remove Old Furnace 45–120 minutes Depends on access, fittings, and disposal route
Set & Level New Furnace 20–40 minutes Plinth or pad adjustments may add time
Duct Transitions 45–180 minutes Sheet metal fabrication for proper fit and airflow
Gas/Electric Connections 30–90 minutes Leak check, electrical breakers, dedicated circuit if needed
Venting/Combustion Air 45–180 minutes PVC venting for condensing units; chimney liner for others
Condensate Drain & Pump 15–45 minutes Routing to approved drain, slope check, freeze protection
Thermostat & Controls 15–60 minutes Wi‑Fi setup, staging, outdoor sensor if dual-fuel
Accessories (Filter Rack/Humidifier/UV) 20–120 minutes IAQ add-ons extend time
Startup, Tuning & Safety Tests 45–120 minutes Combustion analysis, static pressure, temp rise
Cleanup & Walkthrough 15–45 minutes User training, warranty registration steps

Factors That Affect How Long It Takes To Replace A Furnace

Equipment Type And Efficiency

Electric furnaces are generally fastest because they do not need gas piping or combustion venting. Standard-efficiency gas units are next. High-efficiency condensing furnaces require PVC intake/exhaust and a condensate drain, adding notable time. Oil furnaces often need oil line work, filters, and chimney considerations.

Location And Accessibility

Basement and garage installations usually go quicker than cramped closets or low-slope attics. Tight attic access, steep stairs, or long carry distances slow removal and placement. Multi-story homes and townhomes often require more protective measures and careful routing.

Ductwork And Airflow

If the new furnace is a different size or the plenum is mismatched, techs fabricate custom duct transitions. Static pressure issues or undersized returns can require duct changes. The more sheet metal work, the longer the day. Adding return air or sealing leaky ducts can push the job into a second day.

Venting And Combustion Air

Standard gas furnaces may reuse a chimney with a liner, while condensing units need new PVC vent runs and combustion air intake. Wall penetrations, roof terminations, and routing around framing can be time-consuming. Shared vents with water heaters can trigger code changes.

Electrical And Gas Work

New dedicated circuits, GFCI requirements near condensate pumps, or gas line resizing take time. Leak checks, regulator adjustments, and bonding are critical steps. Old shutoff valves or unions that are seized can slow disassembly and increase labor.

Accessories And Zoning

Whole-home humidifiers, high-MERV filter racks, UV lights, or air cleaners add installation steps. Zoned systems with multiple dampers and a control panel require careful wiring and commissioning, which can extend the schedule by hours.

Permits And Inspections

In many U.S. jurisdictions, a permit is required for fuel-fired equipment. Some cities offer same-day or next-day permits, while others take a few days. Inspection timing may add a day if the inspector must sign off before final operation or closing up vent penetrations.

Crew Size And Experience

A two-person crew is common and efficient for most projects. Complex jobs or attic installs may use three to four techs to maintain a one-day schedule. Experienced installers anticipate code corrections, which helps avoid mid-project delays.

Don’t Overpay for HVAC Services – Call 888-894-0154 Now to Compare Local Quotes!

Seasonality And Weather

Winter surges can impact scheduling and parts availability. Roof or exterior vent terminations may need dry conditions or daylight hours, extending timelines. Planning ahead during shoulder seasons can shorten wait times.

Existing Home Conditions

Discoveries like asbestos wrap on old ducts, mold, damaged flues, or corroded gas lines require remediation and permitting adjustments. These issues can add days and occasionally require specialized contractors.

Timeline By Furnace Type

Furnace Type Typical Replacement Time Key Time Drivers
Electric Furnace 4–6 hours No venting; confirm circuit sizing and breakers
Standard Gas (80% AFUE) 5–8 hours Chimney or B-vent, gas line checks
High-Efficiency Gas (90–98% AFUE) 6–10 hours PVC intake/exhaust, condensate drain/pump
Propane Furnace 6–9 hours No utility gas; tank regulator, orifice verification
Oil Furnace 8–12 hours Oil line, filter, chimney liner, nozzle setup
Dual-Fuel (Gas + Heat Pump) 1–2 days Outdoor unit, controls integration, airflow tuning

Gas Furnaces

Gas furnaces require gas piping, shutoffs, sediment traps, and venting that meets local code. Condensing models need PVC venting with proper slope and a condensate drain. Chimney liners may be required when replacing older units to maintain safe flue temperatures.

Electric Furnaces

Electric models are quicker because there is no combustion or venting. Installers verify circuit amperage, wire gauge, and breaker capacity. If a panel upgrade is needed, expect additional time and a licensed electrician’s involvement.

Oil Furnaces

Oil systems include an oil supply line, filter, and often a barometric damper. Installers may need to line the chimney and set combustion with a smoke test and analyzer. Any oil tank or line issues can push the job into a second day.

What Happens On Installation Day

Knowing the steps helps set expectations and reduces surprises. Here is a typical furnace replacement process, from arrival to handoff.

  • Protection & Safety: Floor coverings, isolate the work zone, lockout/tagout power and gas.
  • Removal: Disconnect electrical, gas or oil line, venting, drain, and duct connections. Move the old furnace out safely.
  • Set New Unit: Position and level the furnace. Verify clearances, serviceability, and orientation for airflow.
  • Duct Transitions: Fabricate and seal plenums or transitions. Mastic or tape seals reduce leakage and drafts.
  • Gas/Electric: Connect gas with a drip leg, leak test, and correct pressures. Wire the furnace per code and manufacturer instructions.
  • Venting: Install vent piping or chimney liner. Maintain slope, supports, and termination clearances.
  • Condensate: Route drain with proper slope; add a condensate pump if gravity drain is not possible.
  • Controls: Install or rewire the thermostat. Configure staging, fan profiles, and any zoning controls.
  • Accessories: Add filter rack, media filter, humidifier, or air purifier as specified.
  • Startup & Testing: Run the furnace, measure temperature rise, static pressure, and perform combustion analysis for gas/oil.
  • Walkthrough: Explain filter changes, thermostat use, maintenance schedule, and warranty registration steps.

Permits, Codes, And Inspections

Most municipalities require permits for furnace replacement. Requirements vary, but expect verification of gas piping, venting, electrical, and clearances. Using a licensed contractor helps ensure compliance.

Installers commonly reference ACCA Manual J for load calculation, Manual S for equipment selection, and Manual D for duct design. Gas work typically follows NFPA 54 and relevant sections of the International Residential Code (IRC). Inspectors may require access for visual checks and documentation.

Inspections can occur the same day or be scheduled later. If the inspector must see hidden components (like vent penetrations), that may impact the timeline.

How To Prepare Your Home To Speed Things Up

Preparation can shave an hour or more off the project. Small steps improve safety, access, and productivity for the crew.

  • Clear Access: Move cars, clear hallways, and create a path from the entrance to the furnace area.
  • Declutter The Mechanical Room: Remove stored items near the old furnace and water heater.
  • Secure Pets: Keep pets in a closed room; doors will open and close during the day.
  • Thermostat Access: Ensure the thermostat is accessible and powered if Wi‑Fi setup is required.
  • Outlet Power: Provide a nearby outlet for tools and a condensate pump, if needed.
  • Plan For Heat Downtime: Expect no heat during the work window; have blankets or space heaters ready if temperatures are low.

Seasonal Scheduling And Lead Times

During peak heating season, crews book up and parts can be scarce. Emergency replacements often fit into same- or next-day slots but may limit equipment choices. In mild months, scheduling is easier, and promotional pricing may be available.

Custom components, chimney liners, or special-order furnaces add lead time. Ask about availability when choosing models, especially high-efficiency units with specific vent kits or communicating controls.

Common Delays And How To Avoid Them

  • Permitting Delays: Confirm whether the contractor pulls permits and how inspections are scheduled.
  • Duct Issues: Request a quick static pressure check before the install date to plan transitions or return upgrades.
  • Venting Surprises: Verify if a chimney liner or PVC vent path is required. Pre-approve wall or roof penetrations.
  • Electrical Capacity: For electric furnaces or larger blowers, confirm panel space and amperage.
  • Asbestos Or Mold: If suspected, arrange licensed abatement to avoid work stoppages.
  • Parts Availability: Choose in-stock models if timing is critical; discuss alternatives with similar specifications.
  • Home Access: Ensure someone can authorize changes; missed approvals stall progress.

How Pros Estimate Your Furnace Replacement Time

Contractors start with a site survey. They note equipment location, access, duct sizes, venting, gas and electric, and any accessories. Photos and measurements inform the estimate and parts list.

A load calculation confirms proper sizing. Downsizing from an oversized furnace may require duct changes and affects the timeframe. Installers check static pressure to plan for transitions and filtration upgrades.

Finally, they map vent routes, condensate drains, and thermostat wiring. A detailed plan minimizes on-the-day fabrications and surprises, keeping the project within the time estimate.

Post-Installation Testing And Commissioning

A safe, efficient furnace is more than a hot-air test. Quality contractors perform multiple verifications before calling the job complete.

  • Combustion Analysis (Gas/Oil): Measure O2, CO2, CO, and efficiency; adjust gas pressure or draft as needed.
  • Gas Pressure & Leak Test: Verify inlet and manifold pressures; bubble test joints.
  • Temperature Rise: Compare supply-return delta to the data plate and adjust blower speed.
  • Static Pressure & Airflow: Ensure ducts and filters support proper airflow within manufacturer limits.
  • Vent & Drain Check: Confirm vent slope, termination clearances, and leak-free condensate path.
  • Electrical Verification: Check voltage, amperage, and wiring connections; label breakers if needed.
  • Safety Devices: Verify rollout switches, flame sensors, pressure switches, and limit controls.
  • Thermostat & Controls: Program stages, fan profiles, and schedules; connect Wi‑Fi if applicable.
  • Noise & Vibration: Inspect blower mounting, filter fit, and duct resonance.
  • Homeowner Handoff: Explain maintenance, filter changes, drain cleaning, and warranty registration.

Costs And Time: What They Mean For You

Labor is a major portion of furnace replacement cost, so time on site maps closely to labor charges. Straight swaps with minimal duct work take less time and cost less. Complex venting, duct revisions, and accessories increase labor and material costs.

While prices vary by region and brand, longer timelines generally reflect necessary code compliance and performance upgrades. Asking for a line-item estimate helps separate equipment cost from labor time, giving a clearer picture of where hours are spent.

Scope Estimated Time Labor Cost Impact
Like-For-Like Swap, No Add-Ons 4–6 hours Baseline labor
High-Efficiency With New PVC Vents 6–10 hours Moderate increase
Oil Furnace With Liner & Setup 8–12 hours Higher labor
Duct Modifications / Return Upgrade Additional 4–12 hours Significant increase
Zoning Or Controls Integration Additional 3–8 hours Moderate to high

Frequently Asked Timing Scenarios

Emergency Winter Replacement

Many contractors reserve emergency slots. A straightforward gas furnace swap can still be completed in one day, but model choices may be limited to in-stock units. Temporary heaters can bridge comfort gaps if an inspection delays final operation.

Attic Installations

Attics slow the process due to access, lighting, and working height. Expect 6–10 hours for a simple swap and up to two days if new venting or duct changes are required. Insulation and protection add setup time.

Don’t Overpay for HVAC Services – Call 888-894-0154 Now to Compare Local Quotes!

Basement Or Garage Swaps

These are typically faster thanks to easier access and more room to work. Many complete within 4–8 hours, assuming venting and duct connections align with the new equipment.

Switching To High-Efficiency

Upgrading from an 80% to a 95%+ furnace requires new PVC venting and a condensate drain. Wall or roof penetrations and routing can add 2–4 hours beyond a basic swap, occasionally more if long runs are needed.

Replacing Furnace And Adding A/C Coil

If pairing with a new evaporator coil, add 2–4 hours for coil install, line set work, and refrigerant handling. If a new outdoor unit is also installed, the project often becomes a full-day to two-day job.

Oil-To-Gas Conversion

Conversions include gas meter/tank coordination, piping, venting changes, and safe decommissioning of oil equipment. The project typically extends to 2–3 days, plus utility scheduling time.

Chimney Liner Required

When venting into a masonry chimney, a liner may be mandated for safety and performance. Liner installation can add 2–6 hours depending on the home’s height and access.

Crane Or Difficult Access

Some rooftop or tight urban installs need a lift. Crane scheduling, permits, and rigging plans can add a day of coordination, though the on-site lift is often quick. Safety planning is essential.

Zoned Homes

Zoning panels, thermostats, and dampers require careful wiring and commissioning. Expect 3–8 additional hours, depending on the number of zones and whether dampers or sensors need replacement.

Health And Safety Considerations

Replacing a furnace is not just mechanical work. Installers must ensure safe combustion, proper venting, and correct gas pressures. Carbon monoxide detectors should be present and functional near sleeping areas and on each level, as required by local code.

Contractors also check return placement and filter access to avoid dust bypass and maintain indoor air quality. Post-install, homeowners should know where shutoffs are and how to respond to alarms or unusual odors.

What To Expect During The Day

Noise from cutting sheet metal and drilling vent penetrations is normal. Power or gas will be off intermittently. Doors may remain open for moving equipment. Crews clean the work area, but light dust is possible despite protective covers.

At the end, expect a walkthrough covering thermostat settings, filter changes, and maintenance intervals. Keep all manuals and warranty documents in a safe place for future service.

Documentation You Should Receive

  • Permit Receipts And Inspection Info: Proof of compliance and any scheduled inspections.
  • Model And Serial Numbers: Needed for warranty registration and future parts.
  • Startup Readings: Combustion results, static pressure, and temperature rise.
  • Warranty Terms: Equipment and labor coverage, plus maintenance requirements.
  • Maintenance Schedule: Filter changes, annual service, and drain cleaning instructions.

Questions To Ask Your Installer About Timeline

  • How long will this specific replacement take given my home and furnace model?
  • What could extend the day and how will you handle surprises?
  • Will permits and inspections affect when heat is restored?
  • Are any duct changes needed for airflow or noise control?
  • Who performs combustion analysis and provides startup readings?
  • What is included in cleanup and haul-away?
  • How soon can you schedule and are parts in stock?

Key Takeaways On Furnace Replacement Time

  • Most replacements finish in one day, often 4–8 hours for a like-for-like swap.
  • High-efficiency, oil, or complex installs can extend to 1–2 days or more.
  • Ductwork, venting, and code compliance are the biggest time variables.
  • Permits and inspections may add scheduling time, depending on your city.
  • Preparing your home and choosing in-stock equipment helps keep the job on schedule.

By focusing on a clear scope, confirming code requirements, and preparing the space, most homeowners can expect a smooth furnace replacement within a single day—and a comfortable, efficient result for years to come.

How to Get the Best HVAC Prices

  • Firstly, keep in mind that installation quality is always the most important thing for residential HVAC project. So never sacrifice contractor quality for a lower price.
  • Secondly, remember to look up the latest rebates as we talked above.
  • Thirdly, ask for at least 3 bids before you make the decision. You can click here to get 3 free estimates from your local contractors, and this estimate already takes rebates and tax credit into consideration and filter unqualified contractors automatically.

Lastly, once you chose the right contractor, remember to use the tactics from this guide: Homeowners Tactics When Negotiating with HVAC Dealer to get the final best price.

Written by

Rene has worked 10 years in the HVAC field and now is the Senior Comfort Specialist for PICKHVAC. He holds an HVAC associate degree and EPA & R-410A Certifications.
Share Your HVAC Quote/Cost

Share Your HVAC Quote/Cost

We rely on readers like you to share your HVAC system cost or quote. It really helps other visitors to estimate the cost of a new HVAC unit.

Optional
Optional
ie: Tranx XR13, Lennox xp15
Include Ductwork Replacement? *
Sending

DMCA.com Protection Status